STS-119
DATI DI MISSIONE
Orbiter: Discovery (OV-103)
Incremento ISS: 15A
Lancio: 16 Marzo 2009 - 00:43 CET
Rampa di lancio: 39A MLP1
Atterraggio: 28 Marzo 2009 - 19:42 CET
Durata: 14+1+2 giorni
EVA programmate: 3 (FD5, FD7, FD9)
Altitudine: 225 km
Inclinazione orbita: 51.6 gradi
SSME: 2048/2051/2058
ET/SRB: ET-127/Bi 135 RSRM-103
Software: OI-33
Left OMS: LP01
Right OMS: RP03
OBSS:
RMS:
Prime TAL: Zaragoza
EMU: L3006 up, L3004 down, M3017 up/down, L3011 e M3005
Direttori Volo: R. Jones, P. Dye, M. Sarafin, N. Knight, B. Lunney, T. Ceccacci, K. Alibaruho, H. Rarick, D. Korth, B. Dempsey
CAPCOM: G. Zamka, G. Johnson, S. Lucid, R. Davis, L. McCullough, J. Marschke
LON: STS-127 (OV-105)
LON Crew: M. Polansky, D. Hurley, J. Payette, C. Cassidy.
Equipaggio: da sinistra in prima fila D. Antonelli (PLT), L. Archambault (CDR), seconda file da sinistra, J. Acaba (MS1), J. Philips (MS4), S. Swanson(MS2), R. Arnold (MS3) e K. Wakata (ISS-FE)
156° missione umana Americana nello spazio
125° missione Shuttle
100° missione dopo il disastro del Challenger
12° missione dopo il disastro del Columbia
36° missione del Discovery
28° missione di assemblaggio della ISS
72° lancio dal pad 39A
Obiettivi della missione
- Trasporto sulla ISS del segmento S6 con un nuovo set di pannelli solari e radiatori
- Esperimenti secondari SEITE, SIMPLEX, MAUI e il Boundary Layer Transition Detailed Test Objective
- Trasporto sulla ISS del BMRMM (Bearing Motor Roll Ring Module) ricondizionato dopo il guasto e la sostituzione
- Effettuazione dell’esperimento “Thrust Oscillation Seat DTO” al lancio sul ponte inferiore
Link utili
NASATV:
Programmazione NASATV:
http://www.nasa.gov/multimedia/nasatv/mission_schedule.html
Meteo:
https://spaceflight.nasa.gov/realdata/weather/
Multimedia:
https://spaceflight.nasa.gov/gallery/index.html
Video NASATV:
http://space-multimedia.6x.to/
Materiale informativo:
NASA Data Files:
http://www.nasa.gov/centers/johnson/news/flightdatafiles/index.html
TLE e dati orbitali:
https://spaceflight.nasa.gov/realdata/sightings/SSapplications/Post/JavaSSOP/orbit/SHUTTLE/SVPOST.html
Osservazione visuale:
http://www.heavens-above.com
Materiale della missione:
Press Kit:
Fact Sheet:
Countdown milestones:
http://www.nasa.gov/mission_pages/shuttle/news/119_milestones.html
Press Graphics:
http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts119/news/mob_010909.html
Press EVA Graphics:
http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts119/news/eva_010909.html
Press Animations:
http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts119/news/preflight_vids.html
Briefing & Events schedule:
http://www.nasa.gov/mission_pages/shuttle/news/119_countdown_events.html
Execute Packages:
http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts119/news/execute_packages.html
MCC Status Report:
Finestre di lancio:
http://spaceflightnow.com/shuttle/sts119/fdf/119windows.html
Pagina preparata da Albyz85 e marcozambi