Polish hardware development update

0 Utenti e 1 Visitatore stanno visualizzando questo topic.

Offline Maquis

  • *
  • 39
  • Polish Astronautical Society
    • Polskie Forum Astronautyczne
Re:Polish hardware development update
« Risposta #20 il: Gio 05/05/2011, 12:07 »
Yeah well, I can either write in english or in polish and I guess the latter would be much, much worse ;)
Largest Polish Astronautical Community: http://www.astronautyka.org
Cheers to spacefans Worldwide! :)
 

Offline Maquis

  • *
  • 39
  • Polish Astronautical Society
    • Polskie Forum Astronautyczne
Re:Polish hardware development update
« Risposta #21 il: Gio 05/05/2011, 17:31 »
Can't say more but expect to hear things about Vega soon.
Largest Polish Astronautical Community: http://www.astronautyka.org
Cheers to spacefans Worldwide! :)
 

Offline Maquis

  • *
  • 39
  • Polish Astronautical Society
    • Polskie Forum Astronautyczne
Re:Polish hardware development update
« Risposta #22 il: Ven 13/05/2011, 12:09 »
Basic chassis design for Hevelius 2 is nearly complete so I'll be working with composites this weekend. Hopefully it will all go smoothy.

Things are going forward with our backup on board computer design too. Integration of the elements should commence pretty soon now.

On the other hand we're still gathering ideas for the system. Last wild goose is the suggested capability of sending transmission to ISS and getting a response (forwarding). Therefore we could try getting an indirect signal that way. Pros I don't have to explain I think. Cons - this mode is really power hungry and requires large antenna. 
Largest Polish Astronautical Community: http://www.astronautyka.org
Cheers to spacefans Worldwide! :)
 

Offline Maquis

  • *
  • 39
  • Polish Astronautical Society
    • Polskie Forum Astronautyczne
Re:Polish hardware development update
« Risposta #23 il: Mer 18/05/2011, 14:47 »
Pushing forward.
Some sketches are in attachment.

From other news - PW-Sat is nearly ready to be send to ESTEC.
Largest Polish Astronautical Community: http://www.astronautyka.org
Cheers to spacefans Worldwide! :)
 

Offline Maquis

  • *
  • 39
  • Polish Astronautical Society
    • Polskie Forum Astronautyczne
Re:Polish hardware development update
« Risposta #24 il: Ven 27/05/2011, 09:59 »
Some solid data about CHOMIK, MOLE and MUPUS, You might be interested in.
http://robotics.estec.esa.int/ASTRA/Astra2011/Presentations/session%207b/02_grygorczuk.pdf

In the meantime Hevelius 2 probe is getting shape. 3D models below:

First one is the probe itself obviously, second one is proposed design for camera mount side module which is A-class module (so a full size module). Third image shows Universal Baseplate which is a basic side wall used for mounting experiments. Last image shows O-class null wall - a side filler used when mass constrait is an issue (in example when an experiment has higher mass than usual).
Largest Polish Astronautical Community: http://www.astronautyka.org
Cheers to spacefans Worldwide! :)